Client: UBA |
Project Duration:7th Sept 2017 To 20th Sept 2017 |
Narration:Engineering Safety Investigation conducted on the Three (3) level bank building, sequel to the observation of;
Report of the investigation concluded that; – the Load-bearing system of the building was structurally intact (Not with-standing the defective roofing system), – Certain structural beams, Columns & footings must be retrofitted, – Spalled concrete surfaces must be treated with proper concrete bonding agents before dressing with mortar, – Replace the existing roof with a Hip-roof that gets the water away from the footprint, – Re-locate the roof water tank onto a Steel structure outside the foot-print of the building, -Repaint all external walls with weather-shielded paint. |