U.B.A No 30A Port-Harcourt Road, bridge Head market, Onitsha.

About This Project

Client: UBA

Project Duration: January 2017 to January 2017

Narration:
Engineering Safety Investigation conducted on the four (4) level bank building, sequel to observation of:

  • Spalling of soffit of third floor slab & service stairs landing
  • Long diagonal cracks (3mm to 7mm wide) on the short opposite sides of the archives
  • Rainwater ingress into rear sections of the ground floor
  • Spalling of the rear left side column

Report of investigation concluded that:

  • The third floor slab panel P12 be carefully demolished 250mm beyond its extents and re-constructed
  • Likewise, the cover slab to the service stairs be repaired, with a drainpipe to pipe out the stormwater collected there, all the way down to the ground
  • The cracked short walls to the archives be replaced using engineering clay bricks that can better sustain load
  • The rear left edge column be repaired
Category
Safety Investigations