U.B.A No 30A Port-Harcourt Road, bridge Head market, Onitsha.

 

 

 

Client: UBA 

Project Duration:

January 2017 To January 2017

Narration:

Engineering Safety Investigation conducted on the Four (4) level bank building, sequel to observation of;

  • Spalling of soffit of third floor slab & Service stairs landing,
  • Long diagonal cracks (3mm to 7mm wide), on the short opposite sides of the Archives,
  • Rain water ingress into rear sections of the ground floor,
  • Spalling of the rear left side column,

Report of investigation concluded that;

  • The third floor slab panel P12, be carefully demolished 250mm well beyond its extents & re-constructed,
  • Likewise Cover slab to the service stairs be repaired, with a drain-pipe to pipe out the storm water collected there, all the way down to the ground.,
  • The cracked short walls to the archives be replaced using engineering clay bricks, that can better sustain load,
  • The rear left edge column be repaired.