Guaranty Trust Bank

 

 

           

 

Client: GTBANK Plc

Construction Cost

N3,705,105.45

Project Duration

Dec 2010 to April 2011

Narrative:

Engineering design for  Stormwater collection / Construction of drainage channel from GTBANK branch Owerri 2 to Control point, along Owerri  – Port-Harcourt expressway.

Featuring;

– Survey of drainage basin ¬ 250m along expressway & connecting drainage basins,

– Stormwater  run-off estimation for a connected drainage basin,

– Construction of drainage channel to collect and discharge stormwater at control point.