Client: GTBANK Plc |
|
Construction CostN3,705,105.45 |
Project DurationDec 2010 to April 2011 |
Narrative:Engineering design for Stormwater collection / Construction of drainage channel from GTBANK branch Owerri 2 to Control point, along Owerri – Port-Harcourt expressway.Featuring; – Survey of drainage basin ¬ 250m along expressway & connecting drainage basins, – Stormwater run-off estimation for a connected drainage basin, – Construction of drainage channel to collect and discharge stormwater at control point. |