Client: NIGERIAN NAVY |
|
Construction CostN 3, 750, 000, 000.75 |
Project DurationJune 2016 to Jan 2018 |
Narrative:Engineering design of;
the Nigerian Navy at Ojo barracks; Founded upon water-logged Loose Sandy soils, using raft slabs. |