Client: GTBANK Plc
Construction Cost: ₦3,705,105.45
Project Duration: Dec 2010 to April 2011
Narrative:
Engineering design for stormwater collection / Construction of drainage channel from
GTBANK branch Owerri 2 to Control point, along Owerri – Port-Harcourt expressway.
Featuring:
- Survey of drainage basin ~250m along expressway & connecting drainage basins
- Stormwater run-off estimation for a connected drainage basin
- Construction of drainage channel to collect and discharge stormwater at control point