Guarantee Trust Bank

About This Project

Client: GTBANK Plc

Construction Cost: ₦3,705,105.45

Project Duration: Dec 2010 to April 2011

Narrative:

Engineering design for stormwater collection / Construction of drainage channel from GTBANK branch Owerri 2 to Control point, along Owerri – Port-Harcourt expressway.

Featuring:
  • Survey of drainage basin ~250m along expressway & connecting drainage basins
  • Stormwater run-off estimation for a connected drainage basin
  • Construction of drainage channel to collect and discharge stormwater at control point
Category
Total Engineering Solutions