Client: GTBANK Plc
Construction Cost: ₦ 205,417,323.67
Narrative:
Engineering design of a 3-Level Business Office for GTB Plc at Plot 265 Ikenegbu Layout, Owerri, Imo State. Featuring:
- 10m to 12.991m clear spans of the banking hall
- 9.76m span Steel roof trusses
- Waste-water treatment
- Stormwater drainage
Project Duration: 9th of July, 2020 to 6th of October, 2021