Client: GT BANK |
Project Duration:25 May 2014 to 2 June 2014 |
Narration:Engineering Safety Investigation conducted on the Two (2) level building, sequel to a bomb explosion at the adjacent main market, which sent considerable shock waves to the bank facility. Report of the investigation concluded that;
Adjustments however need to be made to some sagging suspended ceiling hangers overt the banking hall, to restore them to the horizontal soffit. |