Client: GTBank Plc |
|
Construction CostN 2,750,000.00 |
Project DurationJuly 2013 To September 2013 |
Narrative:Structural repairs involving; – Strengthening of 2nd-floor cantilever slab using J162 x 162 UC 23kg steel brackets, – Replacement of damaged block wall with engineering clay blocks, – Finishes & painting |