Client: GTBank Plc
Construction Cost: ₦2,750,000.00
Narrative:
Structural repairs involving:
- Strengthening of 2nd-floor cantilever slab using J162 x 162 UC 23kg steel brackets
- Replacement of damaged block wall with engineering clay blocks
- Finishes & painting
Project Duration: July 2013 to September 2013