GT BANK Plc

 

 

 

Client: GTBank Plc

Construction Cost

N 2,750,000.00

Project Duration

July 2013 To  September 2013

Narrative:

Structural repairs involving;

–          Strengthening of 2nd-floor cantilever slab using J162 x 162 UC 23kg steel brackets,

–          Replacement of damaged block wall with engineering clay blocks,

–          Finishes & painting