GT BANK Plc

About This Project

Client: GTBank Plc

Construction Cost: ₦2,750,000.00

Narrative:
Structural repairs involving:

  • Strengthening of 2nd-floor cantilever slab using J162 x 162 UC 23kg steel brackets
  • Replacement of damaged block wall with engineering clay blocks
  • Finishes & painting

Project Duration: July 2013 to September 2013

Category
Structural Retrofit